Joint Water Project Projected Work Areas (within the next two weeks)
Please be aware that these areas have ongoing or beginning work being performed. Delays can be expected.
Contract No. 1 - Robinson
- Locations: Kingston Rd and Hamilton Rd
- Removing hydrants and valves, preforming restoration, and cutting and capping pipe
- Installing services fr
Joint Water Project Projected Work Areas (within the next two weeks)
Please be aware that these areas have ongoing or beginning work being performed. Delays can be expected.
Contract No. 1 - Robinson
- Locations: Kingston Rd and Hamilton Rd
- Removing hydrants and valves, preforming restoration, and cutting and capping pipe
- Installing services from the Hamilton Rd pump station to Route 5
- Possible work at Hamilton Rd Tank site and Jordan Rd Pump Station
Contract No. 2 – Highlander
- Locations: South St and Route 5
- Installing services on South St
- Drilling Skaneateles Creek on Route 5
- Topsoil restoration from Tops Plaza heading east down Route 5
- Possible work in Jordan but not confirmed